Envia
Inici  >  Temes  >  arquitectura

risk management


Identification code: 300179502
Español: control de riesgo | Català: control del risc



Narrower term/s

Alternative term/s

  • management, risk

Anotations

Scope note:

Planning how to conduct affairs by assessing, minimizing, and preventing potential losses, injuries, or other damages.

Web resources
Powered by: TemaTres 1.5
Avís legal | Accessibilitat | Política de galetes | Sobre gencat | © 2000 The J. Paul Getty Trust. © Generalitat de Catalunya